Direct machinery consultation · Manager Ma · +86 153 0302 4055WhatsApp +86 153 0302 4055
Start with product and process

Turn individual machines into a workable production plan

Tell us what you produce, your target output and packaging format. We can then map the required water treatment, preparation, mixing or emulsifying, storage, filling and packing equipment.

Workshop equipment
RO and EDI Water Treatment Systems
Horizontal Liquid Filling Machine
Real equipment combination · Final configuration requires technical confirmation
Choose by finished product

What are you planning to produce?

Start with the finished product, then review its process stages and related equipment. Formula, viscosity and output must be confirmed for each project.

Fixed Vacuum High-shear Homogenizing Emulsifier01

Cosmetics & skin care

Creams, lotions, serums and products requiring emulsifying, homogenizing, heating or vacuum processing.

  • Creams
  • Lotions
  • Serums
  • Emulsified products
Related equipment
Liquid Detergent Mixing Tank — Steam or Electric Heating02

Personal & home care

Shampoo, body wash, hand wash, laundry detergent and other liquid cleaning products.

  • Shampoo
  • Body wash
  • Detergent
  • Liquid cleaners
Related equipment
Choose by project stage

One machine or a complete line?

New-factory planning and equipment condition are no longer mixed with industry categories. Choose the route that matches your project stage.

01

Add or replace one machine

For an existing facility that needs more capacity, a replacement machine or an additional process stage.

  • Confirm material and target output
  • Check interfaces, voltage and space
  • Confirm standard and optional configuration
Browse equipment
02

Plan a complete line

For a new facility or product line, organized around the finished product and its packaging format.

  • Confirm product and batch output
  • Review utilities and facility conditions
  • Combine processing, filling and packing equipment
Send line requirements
Start your configuration

Share five key requirements first

More specific inputs make the equipment range easier to confirm. Unverified process values are not treated as final configuration.

  1. 1Product to be made
  2. 2Batch or hourly output
  3. 3Viscosity or material sample
  4. 4Container and fill size
  5. 5Facility, voltage and automation requirements
WhatsApp